Friday, September 18, 2009

Kids Bathroom - Progress Notes

OK, so Rob has plugged away at the kids bathroom. The shower head is installed and totally functional. In fact we have been using it... Rob has also worked some on the drywall and also decided to change out the water heater closet door. It is ready to install once the drywall is completed. But Rob is a little unsure about his capabilities with drywall taping and mudding. We do not want it to look like we did it ourselves. So he came up with a brilliant idea! We have a green chevy truck that we bought from a neighbor mainly because she was moving closer to her children and needed to get it out of the yard of the house before escrow closed. It does not run. Well, Rob called a guy that did some drywall for us in the past and did a nice job and asked if he'd be interested in a labor trade for truck deal. BINGO! He is! So we are going to pay him a little cash to cover gas to get to our house and give him the truck. He is going to finish the drywall work in the Girls' room, the kids bathroom and retape and mud our master bathroom that was done by the previous owner and you CAN tell. I'm so excited. He will get the work done quickly and that will rocket our work status ahead drastically. Besides the extra bonus of having one less vehicle cluttering our yard. We are soon to have Jeff Foxworthy jokes written about our yard!

No comments:

Post a Comment